Tuesday, December 6

Ninth week

From Peng
To file
12/6/2011
Test13
13-8’x9’-ledger-OSB-GYP-8’up seam
Pretest
Put the shear wall in the test frame first, then put the gypsum board on it, clap them, drill screws and cut half inch at the bottom. Look good.
Check the OSB side, one fastener at vertical bottom close to the OSB edge.
Other fasteners are okay.
Photo 



Meanwhile, we are doing the fasteners and OSB(horizontal and vertical strand) connection test.




No comments:

Post a Comment