Test13
13-8’x9’-ledger-OSB-GYP-8’up seam
Pretest
Put the shear wall in the test frame first, then put the gypsum board on it, clap them, drill screws and cut half inch at the bottom. Look good.
Check the OSB side, one fastener at vertical bottom close to the OSB edge.
Other fasteners are okay.
Photo 



Meanwhile, we are doing the fasteners and OSB(horizontal and vertical strand) connection test.




Ninth week

From Peng
To file
12/6/2011
Test12
12-8x9-ledger-OSB-54mil-8’up seam cyclic
Pretest
43circles
Reference displacement:2.92x0.6in.
8’x9’ shear wall, horizontal seam at 8’up.Vertical seam at 4’over.
Strap is good.
2 over-drilling screws at the horizontal seam recorded
Anchor spacing is 2’

After test
Peak load+:10049lbs
Displacement: 2.2672in.
Peak load-:-8443.1lbs
Displacement:  -1.6616in.
The failure occur at the bottom, fastener pull through OSB with titled
Fasteners up to 2’high on the chord studs pull through the OSB
At the bottom vertical seam which is up to 1’, the fasteners fail with wood bearing failure and pulling through OSB.
The strap is good, no damage observed
The outside of the horizontal seam tear out.
The connection of the vertical and horizontal seam is broke because of the contact.
Fasteners in the corner at the bottom are cut off the head.
Photo

 After test
Bottom fasteners (1)
 Bottom fasteners (2)
 Bottom fasteners (3)
 Bottom fasteners (4)
 Bottom 


Ninth week

From Peng
To file
11/30/2011
Test 11R
11_Retest_8x9-ledger-osb-54mil-8’up
(stud: 600S162-54mil(33ksi))
Everything looks good.
We use 600S162-54mil(33ksi) as our field studs and chord studs.
Strap is good, no gap.
After test
Peak load:8708.3lbs
Displacement: 2.4182in.
Failure occur at vertical seam and OSB bottom, fasteners titled then pull through.
Failure is at one of 4x8 OSB on south side.
Fasteners at vertical seam on south side complete pull through,
3 fasteners at horizontal seam near vertical pull through
3 fasteners at the bottom near vertical seam pull through.
At the edge of  horizontal seam, OSB tear out.
Fasteners on south side field stud title, no damage.
Observe all the fasteners at the strap and bottom title.
Photo
 After test
 horizontal seam and vertical seam
 After test 
 Middle field stud
 Bottom of vertical seam
 Fasteners at the strap
Fasteners at middle field stud

Thursday, December 1

Eighth week

Assemble another 8'x9'shear wall today.
Double check the details.
Will do monotonic test with Dr.Yu tomorrow afternoon.
Photo

Tuesday, November 29

Eighth week

1.Put the ledger on, test the stiffness.
Stiffness:166.6lbs/in.
2.Put the OSB on, ready to test tomorrow afternoon.The first 8x9 monotonic test.
Photo
                                      



Monday, November 28

Eighth week

1.Put the 8'x9' frame in the test frame.(Move the roller to adjust the 8x9 shear walls)
2.Test the stiffness.(Give 1in.displacement)
Stiffness of the 8'x9' stud to track frame is 94.15lbs/in.
Photo


Monday, November 21

Seventh week

We have already done the test number9 and number 10, will update later...
Get started with 8'x9' shear wall, big guy.
The T shape: we connect two 4'  long T shapes together, but the cross-section of the connection is not flat,it makes the whole T shape look like bending. I will make it flat.

Friday, November 18

Sixth week

From Peng
To file
11/17/2011
Test 8
8*-4x9-OSB-54mil-2’over-8’up seam-cyclic
Pre-test
No over-drilling screw found for test 8. Just 2 fasteners at the bottom is too close the vertical seam, the previous ones was missed the flange of bottom track. re-drilling, too close.
Strap is good,no gap.
Vertical Seam is in the middle, looks fine.
The additional stud is 1’ over. Fastener spacing  is 12in.


After-test
43 circle reference displacement:1.988in.
 The peak is 3929lbs,displacement is3.329in.
The failure occurs at the horizontal seam and vertical seam connection area first, then the fasteners on the vertical seam on the south board pull through OSB.
The 2 fasteners on the 2’x8’ OSB without additional field stud side pull out first at the 38th circle. Fasteners on that OSB in vertical seam fail at 41st circle. Fasteners near the horizontal seam pulled through, others near the bottom wood bearing failure observed. The fasteners tilted observed at the bottom of middle field stud.(2’ to the bottom)
2 fasteners at bottom on the OSB without additional stud failed, one near the vertical seam pull through, the other is wood bearing failure.
Tear-out failure observed at the edge of the horizontal seam.
The additional field stud is fine, no fasteners fail observed.
Fasteners at bottom go through 2 layers steel(track and stud) often get cut off.
 A little lifting up of the shear wall during the test. I don’t know if it is the reason of the hold down or the anchor not tight enough. Will see next test.
Photos
Pretest

Aftertest







 We observed the piece of steel under the washer on the holddown bent a little bit during the test.






Wednesday, November 16

Sixth week

From Peng
To file
11/16/2011
Test 7 
7_4x9_OSB_54mil_8'up_1'over seam_cyclic
Pre-test
43 circles
Reference displacement:1.988in.
There are two fasteners on the seam location is over-drilling, I recorded.
The vertical seam seems a little gap. 0.052’’, but it is okay.
Additional field stud at 1’ over. The additional field stud is 600S162-54mil(33Ksi).
Fasteners on the Strap are good
Two fasteners on the vertical seam miss the flange of the additional stud. Re-drill
See how vertical seam behave..

After-test.
The peak is 3588lbs,displacement is 2.230in.
The failure occure at the vertical seam and the horizontal seam.
The fasteners on the 3'x8' board at the vertical seam pull out.
Horizontal seam, from vertical seam to north chord studs, the fasteners on the top boards pull out. From vertical seam to another side chord studs, the fastener on the seam is fine. The vertical seam failure near the 8’ high come first at 35th circle and the it goes through the bottom and the horizontal seam breaks at 38th circle observed.
The 1’x7’ OSB  good, no fasteners pulled out.
The middle and additional filed studs connection with track, bottom and top track flange buckle.
Bottom, just two fasteners at the 3’x8’ near the vertical seam is pull out, others are fine. 

Photos
Pretest



After test