Thursday, November 10

Fifth week

1. Finished building shear wall number 7 and 8.
2. Cut OSB 3/8'' at the bottom.
3.Have done the test number 5.


After-test
Reference disp:3.313x0.6=1.988in.
43 circles in total.
Peak load:4093.9 lbs
Ultimate displacement+:2.83in
The failure occurs at the bottom at 38th circle
The bottom fastener are pulled out.
Fasteners on the chord studs,2’ to bottom, are pulled out.
2 fasteners on the field stud at bottom is pulled out, bottom one screw head is cut off.
No damage is observed on the strap, no fastener tilted.
Steel channel, hold downs are all good.
Photos  
Pre-test




After-test







Videos
Later, I should combine these two videos.

No comments:

Post a Comment