Tuesday, October 11

Second week

1.Put the 3 CRC on the frame,it is a little bit time consuming, I have to drive a hole on the web of the stud,CRC and the clip angel first,then put them together with a screw.

2. Put a ledger on the frame.

3.Join Dr.Yu group meeting.

This is how the ledger connect the  frame.

The cold rolled channels go through the studs

2 comments:

  1. Excellent, good to see the ledger at its real scale. Did it feel "heavy"?

    ReplyDelete
  2. Yes,I think the ledger will make much contribution to the frame stiffness. Will see.

    ReplyDelete