1.Put the 3 CRC on the frame,it is a little bit time consuming, I have to drive a hole on the web of the stud,CRC and the clip angel first,then put them together with a screw.
2. Put a ledger on the frame.
3.Join Dr.Yu group meeting.
This is how the ledger connect the frame.
The cold rolled channels go through the studs
Excellent, good to see the ledger at its real scale. Did it feel "heavy"?
ReplyDeleteYes,I think the ledger will make much contribution to the frame stiffness. Will see.
ReplyDelete