Saturday, October 8

10/8/2011 Saturday (First week)

1.I have finished all the back to back studs making.

The following is the problem studs which we can't use.
Short stud: 600S162-54(50ksi) Qty 1
Punch-out not in the middle:600S162-54(50ksi) Qty 1
600S162-54(33ksi) Qty 13

What we need:
600S162-54(50ksi) Qty 21  9'
600S162-33(33ksi) Qty 3   9'
1-1/2"*54-mil strap
8'long Qty 5
9'long Qty 9




These back to back studs are for 8'by 9' shear wall.
 The punch-out is not usually at the exact middle of the web,so this may cause the difficulties to put the CRC in the right place.

One stud is short.

These back to back studs are for 4'by 9' shear walls.
 The problem studs,we can't use.
We need more strap.